Mesc Energy Services Ltd.

Projects

Wireline Operations at the Well Site with 50 Ton Crane on the Barge

Construction Of 24” X 24km (Lot 1) Amukpe -Warri Escravos Pipeline Project

Fabrication And Installation Of 4 Pig Traps (4 Receivers) At Oben

Rig up of 50 Ton Crane on a 1000 ton barge

Fabrication Of 8’’ Process Piping For Oben Heat Exchanger Installation Project

Construction 0f 4’’ X 5km Gas Lift Delivery Line